Download a Job's Labour List

18 November 2026
LabourLabour budgetCrewExport

The labour list is a spreadsheet of every labour line on a job. Use it to plan who you need on site, send hours to a subcontractor, or check the labour budget line by line.

Who can do this: owners, admins and office staff. Plan: Crew, Business or Pro.

Before you start: the job needs at least one labour line on a line item. See Build a Job Up: Job Items and Line Items.

Download the list

  1. Open the job and click the Finance tab.
  2. Under Outgoings, click Labour Budget.
  3. Click Download labour list.
The Download labour list button sits above the labour budget table.
The Download labour list button sits above the labour budget table.

The file downloads straight away as an Excel workbook named labour- followed by the job number and the date, for example labour-J000123-2026-11-18.xlsx.

How hours and rates are shown

Labour is priced in one of two ways, and the list keeps them apart:

  • By time. The rate is a day rate. The line's Duration is how long the work takes.
  • By a unit of measure (m², Lm, Nr, Item or Per). The rate is a price per unit, and the Duration is the time the work takes on the schedule.

Every row has a Rate unit column, such as £/day or £/m², so you can always tell what a rate is per. Hours is the duration in hours. For a line priced by time, a day is the working day the line was priced at, so Duration reads the same as it does on the job item. See Your Account's Working Hours.

What is in the file

The workbook has two sheets. Both start with your company name, the job number and title, and the date it was downloaded.

Labour summary

One row for each crew, added up across every job item on the job. The columns are Code, Crew, Rate unit, Total hours, Total qty, Unit, Unit cost, Total cost and Used in job items.

  • Lines that use the same crew preset are combined into one row. Lines with no crew preset are combined into one row called Labour.
  • A crew priced by time and the same crew priced per m² stay on separate rows, because a day rate and a price per m² cannot be added together.
  • Total qty and Unit are filled in only for labour priced by a unit of measure.
  • Unit cost and Total cost are your cost price, not the price you charge. If the same crew has different rates on different lines, Unit cost lists each rate, highest first, followed by "(varies)".
  • Used in job items lists the job items the crew appears on, for example "Item #1, Item #3".
  • Rows are sorted by Total cost, highest first. The Total row adds up the hours and the cost.

By job item

One row for every labour line on the job, in job item order. The columns are Item #, Job item, Line item, Code, Crew, Duration, Hours, Qty, Unit, Rate unit, Unit cost, Total cost, Unit price and Total price.

This is the only sheet that shows your sell prices (Unit price and Total price). It ends with a Total row of hours, cost and price.

What the list includes

  • Labour on every job item, whatever its status.
  • Labour from change orders once the change order has been applied. See Approve and Apply a Change Order.
  • Totals exactly as they are saved on each line, with no VAT added. They match the budget on the Labour Budget page.

It does not include time staff have actually logged, travel or adjustments. Those stay on the Labour Budget page. See Labour, Material and Plant Budgets.

Amounts use your account's currency.

If the download does not start

  • "Nothing to export": the job has no labour lines. Add labour to a line item, then come back to Labour Budget.
  • "Failed to download labour list": try again. If it keeps failing, contact support.